Skip to content
Friday

7 September 2012

Power, Greed And Freedom

Dated photos
512
Source pages
1
Media
3
A smiling man with long dark hair sits on an ornate gold and red throne in front of a pink and purple backdrop. He wears an orange-saffron cloth draped over his shoulders and a long mala of dark rudraksha beads with a gold ceremonial pendant. A white horizontal tilak and red bindi mark his forehead, and a small microphone is clipped near his mouth. a person is seated in a satsang setting.A seated man in an orange-saffron garment wears long dark hair, a white vertical forehead mark with a red bindi, and a long double strand of dark rudraksha beads. He sits in front of an ornate gold-and-red throne, raises his hand to his mouth in thought, and holds a dark tablet-like object in his other hand. A carved gold kalasha-style pole and bells hang at left, with a blurred yellow foreground and blue draped backdrop.A shaved-headed man in an orange-saffron robe with a matching orange shawl stands at the centre, raising a tiered silver aarti lamp with many flames high above his head with both hands. Behind him a large seated audience in white, red and pastel clothing sits in rows holding small lit candles and palms pressed together in prayer. The wood-panelled hall has a wall clock and dark red paneling.

September 07 2012

Original wiki page
Contents

Title:

Power, Greed And Freedom

Description:

TALKS FROM MORNING SATSANG ON SEPTEMBER 7, 2012 IN KODAIKANAL, INDIA Bhagavad Gita (Song of God) is a timeless treatise on the essence of living enlightenment. The Gita was imparted by the enlightened Hindu incarnation Sri Krishna to the warrior-prince Arjuna over 5000 years ago. Amazingly, the spiritual wisdom and life solutions offered in the Gita are so universal and current that even today it is used as a personal transformation guide. In today’s talk on Bhagavad Gita, chapter 6, verse 9, Paramahamsa Nithyananda (Swamiji) reveals the layers of collective consciousness and how the world reflects them. Humans have potential to create three kinds of lifestyle, depending on their level of awareness. When society is dominated by the collective subconscious, it creates a money-chasing lifestyle ruled by greed. When collective unconscious has control over society, it evolves a lifestyle based on power and ruled by fear. Once we become aware of our greed and fear, and release them, we transform to a freedom-based system of independent thinking and individual responsibility.

Link to Video:

VideoAudio

Transcript:

Power, Greed and Freedom

Discourse by Paramahamsa Nithyananda

September 7, 2012

Bhagavad Gita – 6th chapter, DhyanaYoga, 9th verse

Suhrun-mitraar-yudaaseena madhyastha-dveshya-bandhushu l

Saadhush-vapi cha paapeshu samabuddhir-vishishyate ll

The Translation:

The one who feels the same towards an affectionate person, a friend and enemy, the indifferent, the neutral, the hateful one, the unfriendly, the noble one or a sinner is said to be established in a superior state.

Understand these few basic sacred secrets. Meditation is not an action. It is a lifestyle. That is why in the chapter on Meditation, Bhagvan is talking about all these things. You can never start meditating, you can only become meditative. Understand, there is a vast difference between starting meditation or becoming meditative. Meditation is not a Anacin, Metacin, Antidepressant. No! Meditation is not Anacin, Metacin, Antidepressant. Please understand, meditation cannot be just repairing something in you. It has to completely transform you.

Meditating is different; being meditative is different. In this verse Bhagavan is very clear; your whole life should become meditative. The whole life should become meditative. Yesterday he was addressing objects, yesterday Bhagavan was saying, explaining in the last verse, how not to be disturbed by objects.

Now Bhagavan is going to the next step, how not to be disturbed by the persons. Actually the seventh, eighth, ninth verses of Bhagavad Gita, these three verses can become a powerful samyama. First he has given us the technique to work with cold, heat, unpleasant, pleasant situations. Then he took us to the next level working with the fear-based mental setup and greed-based mental setup where you are free from the concept of greed. Now he is taking us to the next level, where he is making us free from the concept of higher, lower human beings. First he liberates us from atmosphere, weather, outer/inner. Outer is heat and cold. Inner is pleasant, unpleasant. Then he liberates us from the greed, objects.

Sama loshtashma kanchanah – where you are free from cold; time and/or mud or a stone. He is making us free from the greed based patterns, greed. Now he is liberating us from human beings, sufferings that can be caused by human beings.

How when you drink more and more honey, only then you understand and enjoy it, same way only I am enjoying this Bhagavad Gita. Understand, through this verse, Bhagavan is liberating us from fear-based system. Yesterday itself I spoke on fear-based, greed-based, both the systems. But yesterday’s verse, Bhagavan’s Bhagavad Gita verse was talking only about the greed. Sama loshtashma kanchanah. He was only talking about having impartiality between mud, stone or Gold.

Today he talks about the power-based system, human beings, power-based systems. Please understand, power-based system is a product of human unconsciousness, greed-based system is a product of human sub-consciousness. Understand, power-based system is product of collective human un-consciousness; greed-based system is product of collective human sub-consciousness. You may ask ‘what is the difference?’ Unconscious means completely, the parts of which you are not unaware ( should be ‘aware’ ? ) but you try to make it aware, without awakening that unconscious into the super-conscious.

Everybody has the feeling to become Lord of the Universe. You can become if you make your unconscious into conscious and super-conscious. When you make your unconscious into conscious, you will become Lord of you. When you raise that to super-conscious, you will be the Lord of whatever is in your space. More than the word Lord, I will use, you be in tune with the whole. This is the right way of becoming Lord of the Universe. But instead you try to become a power center through political power. I tell you even in the school, the class leader is nothing but political power! Why, why even in the school we can’t survive without a leader? Why should somebody aspire to be a class leader?

First time I resisted this political structure is when I was appointed as a class leader, when I was in the seventh standard, I still remember, the teacher, she was a Jain family, teacher. I used to be little tall, so usually that is the standard. The tall, last bench, last row guys, they will only be made as leaders. There is no other standard. One day she caught me. Unfortunately that day I went to school! Usually I don’t go! Somehow I went to the school, may be 1st day of the school, like that, those auspicious days I don’t miss! She caught hold of me and she said you are the leader of the class. I said “what do you mean leader? I don’t even come to the class regularly!” She said “That is why I am making you leader. If you are leader, you have to come and regularly take the attendance and you have to keep the class under control”. And I said “Nothing doing!”

Leaders are the greatest followers! They lose their freedom. They become leader to have freedom, finally they lose their freedom!

When I studied actually, the school was not like this, it was only thatched. Now only it has become RCC building! It was just thatched hut! Then in Tamilnadu there was a law made that - No thatched hut, schools! That is why they changed into building.

Anyhow, politicians even though they are Heads of each constituency, members, they don’t have freedom to go to 10 day’s vacation! See if I want one day after Inner Wakening is over, I can simply start, go wherever I want. I have more freedom! Anyhow, forget about them.

So I told my teacher “No, I will not be leader!” She insisted. Then we got into the argument. I said “Leaders are the people who are not able to lead themselves, so they go on trying to satisfy that unable to control themselves by controlling others”. When you are not able to lead you, that unfulfillment, you try to fulfill by leading others or trying to lead others. Leading others is the ultimate hypocrisy! He also knows he is not going to listen to you; he will topple you down, the moment he gets a chance. What is leadership? Group of followers waiting to topple down one person! That one person is called Leader. The unconsciousness, when it is not able to express, through the proper channel and it finds shortcut to fulfill its ambition, it is called power structure.

When the sub-consciousness is not able to fulfill its purpose, the perversion it creates is greed structure. Let me explain this sub-consciousness. What is sub-consciousness? Sub-consciousness is nothing but the space where you dump your unfulfilled, but imagined, visualized, fantasies. For example, if you are fasting by suppressing your desires for food, in three days, you will see in the dream you are feasting! And I tell you, my Niraharies, not single one of them has a dream about eating! That is the beauty! Only now when I said, you even remembered!

Understand, in usual fasting it is a law, if you fast for three days, you will see that you are eating, having feast in the dream. I am telling you with confidence without even asking you guys that none of you guys will have even dream about food, because your samyama is not based on suppression. You don’t need to justify or tell because I told. Tell me, anybody? But usually if you have fasted without doing this samyama, as a regular fasting, talk to the people who fast, go to the internet, you will find.

Anybody who fasts, it’s a rule, within 3 days they will feast in the dream. Only when you don’t eat in the dream you are doing samyama, only when you don’t have wet dreams you are a Brahmachari. The suppression creates sub-consciousness. Understand, the things you imagined, visualized, could not achieve but suppressing it, that is sub-consciousness. That, when it is not able to fulfill itself, it comes out of you as a greed perversion.

What is the way for the subconscious to release itself properly? Right amount of sleeping and dreaming! I tell you, if you have the right quality and quantity of sleep and dreaming, you will not suffer with greed based structure, you will not be running behind money which is not required for you. That is why all the civilizations which are suffering with greed, suffer with sleeplessness. All the civilizations which suffers with the subconscious, greed, suffers with sleeplessness. I tell you, healthy sleep and dream, you will be free from greed based structure.

If the whole humanity gets into healthy dream and sleep, Wall Street will collapse! If the whole humanity meditates, power centers will collapse! That is what is going to happen between 12/12 to 12/15. It is not that the ocean is going to come and eat the Wall Street; ocean is going to come and eat the Whitehouse. No! Conscious Ocean is going to come! I tell you, if good quality sleep and is allowed, then you have the dreaming time. The moment you dream, your greed, the suppressed imaginations are released from your system.

You can see in your life, if you have wet dream one night, at least for next ten days your body does not ask for physical intercourse. Same way, if you dream about having huge wealth or enjoying whatever you imagined and suppressed like a huge house or car, suddenly the agitation to rush towards them disappears in your system.

Understand, I am going to the root of human suffering. Greed based system, the money based lifestyle is rooted on your sub-consciousness, A good sleep, good sleep will naturally have proper period of conscious dreaming. When I say conscious dreaming, even in the dream you will have certain amount of self-awareness and you will be able to move some things in the dream. You yourself will know you are dreaming and you can alter the things in the dream. That is what I call conscious dreaming. If you are having conscious dreams please understand, your sub-conscious is very thin layer. You don’t need to worry at all about your sub-consciousness. There are no much suppressions.

All of you understand this concept of conscious dreaming means, you will actually, if you are in, you are living in USA, you just dream you are in South Africa; but you remember your identity and the house, car and all, you feel you can change, you can decide. That is what is conscious dreaming. How many of you have awareness while you are dreaming? You guys be very clear you don’t have sub-consciousness. Your subconscious is very thin layer. You don’t have much suppression.

If human beings have good quality and quantity sleep, the greed which makes their nervous system agitated, which convinces their nervous system to do illegal, immoral activities, to grab other’s wealth will disappear. Understand, for a vehicle to move on the ground, there is the road which is required. For flight to land on the ground, the runway is required. Same way if you need to be convinced to do something immoral, certain insensitivity in your nervous system is required. If you need to be convinced to do illegal things, certain thickness, insensitivity is required in your nervous system.

Not having the good quality and quantity of sleep makes your suppressed desires into the thick dreams, not conscious dreams. Thick dreams even while you are awake, those thick dreams are running in your nervous system and makes you function as it wants, not as you want. That is why I tell you, there are millions of people who wake up but never come out of sleep. Just like sleep-walking, sleep-living is a disease. But cure is only spirituality! Only spirituality can cure this sleep-living.

Understand, the sub-consciousness, suppressed desires, sub-conscious based, is greed structure. That is why when some poor fellow becomes rich, he does exactly what he knows the rich people will do. When a Indian becomes rich, he does exactly as a British next fellow will do, because these fools have forgotten they don’t even know, they have not seen how a Indian rich fellow will live!

The suppressed desires form sub-consciousness. It can either express itself properly through the dream state, conscious dream state and liberate your system from its influence. But when you don’t allow that conscious dreaming, and the good quality, quantity sleep, it overtakes you, just overtakes you and the system you create is greed based money system. The collective suppressed sub-conscious is responsible for the collective belief, mass hysteric belief! That is the right word I will use. Mass hysteric belief of money!

Next when the unconsciousness, unconsciousness means you just don’t know what you are missing but you are missing something. When you know what you are missing, it is sub-consciousness; when you don’t even know what you are missing, but you are feeling you are missing something, it is unconsciousness; when you don’t miss anything, it is consciousness; when you become Mister of the Universe, it is super-consciousness! When you know you are missing something and missing, is sub-consciousness. Please understand, when you don’t know you are missing something, but you feel you are missing something; you don’t know what you are missing, but you feel the emptiness, you are missing something, that is unconsciousness. When you don’t miss anything, complete with yourself, it is consciousness. When whole Universe feels the fulfillment through you, it is super-consciousness!

Understand this! I think the most perfect spiritual psychological definition of the states! When you know you are missing something and missing it, that is sub-conscious; when you know you are missing something but you don’t know what you are missing, you just know you are empty but you don’t know what you are really missing, that is unconscious; when you don’t miss anything, when you feel fulfilled, it is consciousness; when the whole Universe feels fulfilled through you, it is super-consciousness!

Understand, this unconsciousness you don’t know what you are really missing, what you really want, but you feel emptiness. That is why you think “Oh, if I become MLA, I think, I will feel fulfilled; if I become MP, I will feel fulfilled; if I become President, I will feel fulfilled; if I become Prime Minister, I will feel fulfilled!” Unconscious man acts as if he is going to fill other’s sub-consciousness so that he can become leader. That is why thebpoliticians always give big, big promises. They give you the feeling “I will fulfill your sub-consciousness!” And the same way, sub-conscious fellows promise the politicians that “We will fulfill your unconsciousness!”

It is the sub-consciousness scratching the back of unconsciousness and the unconsciousness scratching the back of sub-consciousness. This is what I call Democracy! Any political system! I am not just against Democracy or Autocracy or Communism. No! I am basically against all political systems. It is time, Humanity can think apolitically! It is time humanity can look into the system of awakening human consciousness. At least sub-conscious man if he gets money or power, what he will do, you can predict, but you can never predict what an unconscious man will do if gets power or influence! No one predicted Hitler will do what he did!

Unconsciousness is wild! At Least sub-consciousness is kind of a wilderness which can be imagined. That is why when a subconscious based person, when he gets money you can always predict what he will do; but when unconscious person, when he gets power, they do unpredictable things! Sub-consciousness forms the basis for money based thinking, greed based thinking; unconsciousness forms the basis of fear based thinking, power based thinking, political thought trends.

Bhagavan Sri Krishna, the greatest visionary, happened on the planet earth. I tell you, even Shiva is only the great master, spiritual master, enlightened master, guiding more and more people to get enlightened. But only Krishna creates an ambiance for mass enlightenment! These last three verses, if India listens to these three verses, if India listens to these great truths, it will get back to its glory, which Krishna created 5000 years ago.

Neither West listened to Christ nor East listen to Krishna. Christ said “If you are slapped on one cheek, show the other”, West did not listen to it. Krishna said “Remember me and wage the war, I am with you”, East did not listen to it. Neither the East listen to Krishna nor the West listen to Christ. Even though they accepted Krishna and Christ as their ideals and the founders of their religious traditions, they have not accepted their ideas. Accepting somebody as an ideal can be a political decision. Accepting somebody as an ideal does not mean you accept their ideas also. Neither East listen to the Krishna, nor West listen to Christ.

If India listensto these three verses, it will be totally different. Otherwise it is like Congress installing Gandhi’s statues. One of the worst things happened to Gandhi is his face being printed in the currencies of India, because for the every corruption he is the witness! Insider witness! Without invoking him, no corruption happens; without invoking his presence, no illegal activity happens. One of the worst punishment given to Gandhi is his face being printed in all Indian currencies. There is no murder without his photograph involvement; there is no corruption without he being invoked.

There is no illegal activity like paid advertisements. Paid advertisements, paid News is equivalent to buying judgments. Whole society cries so much about judgments being bought! Why nobody bothers about paid News? Paid News is much worse than judgments being bought. Whether you buy judgment or paid News, everything unfortunately happens invoking Gandhi’s face. What to do? It’s really unfortunate.

Understand, sub-conscious fellow, even if he gets the power you will know the trend in which he will flow. He is only equal to the dried river. Even if the river is dried, when the flood comes again it will only go in that current, in that created channel. But unconscious fellow is like a tsunami! There is no trend set. It’s like Ocean coming out. So the conscious damage done to all Human beings by the unconscious political system is too much than the sub-conscious greed based money system. This verse –

Suhrun-mitraar-yudaaseena madhyastha-dveshya-bandhushu l

Saadhush-vapi cha paapeshu samabuddhir-vishishyate ll

samabuddhir-vishishyate – Bhagavan is revealing powerful truth to all of us to be in

samabuddhi, equal mind, same towards affectionate person, a friend, an enemy, the indifferent, the neutral, the hateful, the unfriendly, the noble one or the sinner, means realizing the futility of the power structure. It is power structure which classifies somebody as right/ wrong; good/ bad; neutral. It is your ambition towards the power structure and the ambition they may ( change ? ) you.

Please understand when the political thought trend damages your consciousness and mind, that makes you believe that somebody is good to you; somebody is bad to you; somebody is neutral with you; somebody is good to everybody; somebody is bad to everybody. See, if somebody is good to you, he is your friend; if he is bad to you, he is your enemy; if he is neither good nor bad, he is neutral. If somebody you are made to believe by the political structure he is bad to everybody, he is called sinner. If you are made to believe by political structure he is good to everybody, he is Sadhu. I tell you it is all just PR exercise, simply PR exercise.

On the car, they do a Teflon coating for not to have scratches. Same way, some of the politicians having some Medias in their hands, and through the paid News, make society believe they have a Teflon coating, they can never be scratched. Whatever allegations are put on them they behave as if they have a Teflon coating. No, now the dent is too much! Hole goes deeper than the Teflon coating.

All the ideas you carry, somebody is a saint, somebody is a sinner, somebody is friend, somebody is enemy, are all just forced on you after completely deluding you by the strong beatings. It is like somebody hits you on the head, you are reeling; at that time he says I am the big guy! Naturally what will you do? You say yes and fall! First the political system is used to hit you; when you are reeling, when your head is reeling, then they claim see I am in this post; he is good, he is bad.

It is time we bring human civilization where the money, money based thought trend and political thought trend does not become part of our life, it just stands as a utility! Let the shoes be left in the shoe stand; umbrella be left in umbrella stand! Let them not come to the bedroom. Let the influence over the citizens by the political system be reduced. Let the influence of the money thought trend over the citizens, humanity, be reduced. Let them be just for only utility. Let it not become lifestyle. Unfortunately politics became regular business. Business became ambition to have power over politicians. When the business gets the ambition of power over politicians and the politicians decide to make their lifestyle as a business both corrupt each other and destroy humanity.

Like the fire and firecracker, when they mingle together, they kill human beings. If the fire, firecracker meeting is away from you, they can be celebration. The fire and firecracker meets over you, they can be death! Politicians are firecrackers, businessmen are fire. When these both thought trends combined hits at you, you are dead, at least severely injured. You are left to be alive after being severely injured, so that they will have their followers.

I tell you, no politician would love to have human beings on the planet Earth if there was no election. They need followers! That is the only reason they want human beings on planet Earth. Otherwise politicians are the most frightened people on the planet Earth. They are afraid of their own shadow. They will have a fear, at one day even their own shadow may go against them, conspire against them.

So the idea of saint or sinner, what is saint or sinner? If you are made to believe one person is doing good to one person, that one person is called your friend. If you are made to believe that one person is doing good to everyone, he is made to be believed as a saint! Saint or sinner; good or bad is all the ideas your consciousness perceived when you are beaten by the political power based thought trends. As a child you are beaten.

I wanted my Gurukul kids to be pure Jeevanmuktas, neither beaten by the power based thought trends, nor beaten by the greed based thought trends. The Economy my Gurukul kids need to learn is there’s no money. The social science my Gurukul kids need to know is there’s no power structure. In the young age you all learned who is MLA, who is MP, what is Rajasabha, what is Lokasabha, what is Prime Minister, What is President! My Gurukul kids should know there is no such thing exists. These are all for utility!

Young age you learnt Economy, one plus one is two; two plus two is four; what is interest; what is compound interest; how the investment should be done. My Gurukul kids should know there is no one plus one, there is only One which is beyond one! The one itself was created for utility! And the one plus one is also utility. Things you created for utility, when you became utility for them, it is like you create fire for you cooking and eating but fire eats you. You create fire for your eating, but suddenly fire becomes big and eats you! People who are eating from the fire are conscious beings, people are eaten by the fire are unconscious and sub-conscious beings.

Here Krishna says “Wake up! Be a conscious being!” That is what I call Inner Awakening! The waking up to the facts of power based political thought trends and protecting yourself is En Leadership! Waking up to the facts of greed based money thought trends and protecting yourself is EnWealth! Let the Wealth be Enlightening Wealth! Let the Leadership consciousness be Enlightening Leadership consciousness in you!

It is so unfortunate, even some of the most intelligent people are caught in this thought trend and unable to come out of it! Understand the roots of why you feel somebody is friend; somebody is enemy; somebody is neutral; somebody is good; somebody is bad. Then you will understand all your ideas are just ideas! When you realize that, everybody will be graceful! The moment you feel everything and everybody is graceful, that is when you achieve what Bhagavan calls samabuddhir-vishishyate! Let your thought trend be repaired, purified, cleansed!

Let the political thought structure which is unconsciousness based and the economical thought trend which is sub-consciousness based not hit at your consciousness, let that not form your lifestyle! Thought trend, let that not create your major decisions. Let that create right understanding about life in you, let you become Jeevanmukta! Understand, if you understand how the collective unconscious thought trend damages you, collective sub-conscious thought trend damages you, and if you protect yourself consciously from those damages and live a whole life, you are Jeevanmukta! Live Jeevanmukti!

What I called yesterday as a Sadhu and today what I am calling as Jeevanmkta is one and the same! Just I am using a different word. The word Jeevanmukta is already branded with me. The word Jeevanmukti is already branded. And Living Enlightenment became our branding! So I am using the word Jeevanmukti! The word Sadhu or Jeevanmukti is one and the same.

Liberated while you are living by the not just individual sub-consciousness and individual unconsciousness, you should be free from collective unconsciousness and collective sub-consciousness impact on you also. When you have greed to have diamond rings it is individual sub-consciousness attacking. When you are having the greed to be appreciated, by so many people due to these diamond rings, it is collective sub-consciousness attacking you. When you feel to become your class leader, it is individual sub-consciousness (should it be unconsciousness ? ) attacking you. When you feel the whole world should praise you, whole school should praise you, the whole society should praise you because you are a leader, it is collective unconsciousness attacking you. When you are free from all the four enemies, you are Jeevanmukta!

I am giving you the essence of these three verses. First, Samyama on cold, heat, unpleasant, pleasant, to prepare you. Then break free from the greed based money thought trend. Then break free, free yourself from the power based political thought trend. You are a Jeevanmukta, what Bhagavan calls Sama loshtashma kanchanah, samabuddhir-vishishyate - should become lifestyle in you, life in you.

So everydaywhatever I am sharing in the morning Satsang, is making you meditative! Not just meditating, that’s only one part! Meditating I make you do to the end; but see, last twenty minutes you are meditating. This whole Satsang is to make you meditative!

Even if you compromise with the power based thought trend and money based thought trend, let you do after understanding the insider secrets of both systems, then you will not be taken away by it, you will protect yourself. You will know where to keep the fire, how to cook and how much heat, can food can go inside and how, when it is dangerous, and you will be intelligent to play the game. At the most may be rarely as an exemption, accidents may happen, you will die. But as a life you may protect yourself, but when you don’t even know the political thought trends are from unconscious and money based thoughts are from sub-conscious, you give them sacredness, you associate sanctity to both. When you associate, even if you associate legitimacy to both of them, you are wrong! If you associate sacredness to both of them, you are worshiping Devil thinking it’s God. Internally do not give legitimacy to the money based and power based thought trends, fear based and greed based thought trends. Let it be not legitimized.

I tell you, whether it is a fear or greed, let me have both only from the enlightened source. It will give you the greed to destroy all other greeds, it will give you fear to destroy all other fears. It will not add more to what you are having. Understand, the fear you receive from the Master is water on fire, not Kerosene on fire. The greed you receive from the Master is water on fire, not Petrol on fire. Both looks fluid being poured on fire. See from the society the fear you get and greed you get; In the Sangha from the Master, the fear you get , greed you get both look like fear and greed. What is poured from the society is Petrol and Kerosene; what is being poured from the Master is pure water and ice bars, ice cubes. Both may look like liquid but quality is different!

Even in my Sangha I have certain fear or greed I create which people think which is not necessary. It is necessary because you have become insensitive. Fire is too big now. I have to pour something. You already put fire on yourself. I have to pour something on you. Only then the fire will come down.

Sometime people ask me “Here also we have to work, outside also we have to work, better we can work outside”. This is the exact foolishness! That person also pours something liquid on me, this person also pours something liquid. Better let the outsider pour something liquid! Don’t you understand it’s Petrol, I am pouring water! Liberate yourself from the collective unconscious conspiracies in which even the conspirers themselves are caught without knowing it’s a conspiracy. Unfortunately they even believe it’s a great service done to everyone.

I wanted, by the grace of the Devine, I will do it. Just like how mass youngsters are going behind these political parties and IT companies, means power based thought trend and money based thought trend! I assure Oh Humanity I will make crores of people follow this Freedom based thought trend! We will create Humanity living Enlightenment, not just community! Now we have created the community living Enlightenment, we will create Humanity living Enlightenment! Anybody who understands and uses power based thought trend and the greed based thought trend; like anesthesia, anesthesia you can neither use too much, nor use less. If you know how to use only amount required from others, you become right Leader, Enlightened Leader.

Question: Re: Taj Mahal or Tejo Mahalaya Temple:

Swamiji, from recent discoveries and research by prominent scholars, it is being said that Taj Mahal was a Shiva Temple which has been converted like thousands of other similar Temples in the Muslim Mughal period of invasions and conquerors. Taj Mahal is octagonal in shape next to the sacred Hindu river Yamuna, has Hindu design, has a lotus kalash cap on the dome, has a music chamber which is completely against Islamic buildings, trident and earthen lamps everywhere and further the entire Taj complex comprises of 400-500 rooms. Residential accommodation on such a stupendous scale is unthinkable in a Muslim structure. Eminent historian P.N. Oka has written a research book of over 100 Documentary evidences to prove the Vedic origins of Taj Mahal. Couple of evidences below: Shahjahan’s own court chronicle the Badshah Nama admits ( page 403, volume 1 ) that a grand mansion of unique splendor capped with the dome – Imarate Alishaan Gumbes – was taken from the Jaipur Maharaja Jaisingh for Mumtaj’s burial and the building was known as Raja Mansingh’s palace. A wooden piece from the riverside doorway of Taj , subjected to carbon (fourteen ?) test by an American laboratory and initiated by a professor at Grad School of Architecture in New York has revealed that the door is 300 years older than Shahjahan, reason being - since the doors of Taj were broken by Muslim invadors repeatedly from the 11 th century onwards, had to be replaced from time to time. The Taj edifice is much more older. It belongs to 1155 AD that is almost 500 years before Shahjahan was born. What is the truth Swamiji and what is the way forward for India to restore and correct these historical crimes done to her?

Answer:

First I wanted to tell you, from the Akashic reading I confirmed whatever you said is true; understand, not just from my intellectual beliefs, intellectual analysis or my own thinking or my vested interest or what I wanted it to be, no, without any of that, straight from the Akashic readings! Please understand Akashic reading is very sacred! And I am responsible to answer to KalaBhairava and KalaBhairava is, you know! Don’t meddle with KalaBhairava, don’t mess with KalaBhairava! I tell you, from the Akashic readings I can tell you, it was Shiva Temple and one part was used as a palace. It was not built by Shahjahan. It was only remodeled by Shahjahan. These are the historical crimes done to India. The only way to restore is let there be more and more and more Jeevanmuktas penetrate the Indian political system. Through the Jeevanmuktas let them come out of vote bank politics to truth based politics. Now it is all vote bank politics. They need to come to the truth based politics. Let us work, work, work to bring purity in political system, purity in every structure of society.

Photos From The Day:

Sakshi Pramana:

Sharing from Nirahara Samyama

Tags:

Bhagavad Gita, living enlightenment, Hindu, Krishna, spiritual wisdom, life solutions, universal, personal transformation, Paramahamsa Nithyananda, reveal, collective consciousness, world, human, potential, create, lifestyle, awareness, society, collective subconscious, money, greed, collective unconscious, control, evolve, power, fear, transform, freedom, independent thinking, individual responsibility.

Photos Of The Day:

Morning-Puja-and-Satsang

Kalabhairava-Darshan

Photos Of The Day:

Morning-Puja-and-Satsang

Darshan

Lunch

Yoga

eNGenius

Kalabhairava-Darshan

01-Morning-Puja-and-Satsang

02-Darshan

05-Kalabhairava-Darshan

Photos from this day

View all 512 photos

Photos From The Day:

1 photoSource gallery
A man in saffron-orange robes sits cross-legged on an ornate gold-and-red throne on a raised stage, speaking and gesturing with his right hand while holding a long decorated staff wrapped with white cloth. He wears a rudraksha mala and a large ceremonial gold necklace, with a tilak on his forehead. Flower arrangements in blue and red vases with orange blooms and dried grain stalks flank the throne, and a red-and-white backdrop is behind. Two seated listeners in the foreground, one with curly dark hair and another in a red-trimmed garment, face the stage. Swamiji (probable) is seated on the throne with distinctive saffron robes, long hair, rudraksha mala and gold necklace, giving a satsang talk.

Morning-Puja-and-Satsang

57 photosSource gallery
A seated man in saffron-orange cloth wrapped over one shoulder sits cross-legged on an ornate gold-carved throne with a red cushion. He wears long double rudraksha malas with gold spacers and a gold pendant at the chest, a gold pendant necklace, and hoop earrings. His long dark hair falls past his shoulders, with a white tilak band and red bindi on his forehead. His hands rest together in his lap, and he gazes calmly ahead. Behind him a pink backdrop is visible.A seated man with long, swept-back dark hair and a white horizontal tilak with a red dot on his forehead wears a saffron-orange sleeveless wrap over bare shoulders. Multiple strands of dark rudraksha malas with gold spacers and gemstone-set ornaments hang across his chest, with a gold pendant at the centre. He sits in front of a blurred floral arrangement of orange and pink flowers, with a gold-embroidered cloth at the upper right and a purple backdrop at left. Swamiji (probable) is shown in this satsang-style setting, appearing in person, with saffron clothing, rudraksha malas and long hair as the distinguishing cues.A seated man in an orange-saffron shawl draped over his shoulders and torso, wearing multiple strands of rudraksha beads with gold-and-gemstone ornamental pendants and a matching rudraksha waist cord. He has long, swept-back dark hair, a white horizontal tilak with a red dot on his forehead, and a small gold earring. He sits on a red cushioned seat in front of a purple draped backdrop, with orange and white flower arrangements beside him and a gold-patterned chair edge at left. a person, meditative posture, hands resting on his lap. Photo of a satsang-style seated presence.A seated man on an ornate golden throne with red cushions, wearing an orange-saffron draped garment with a gold border, multiple strands of rudraksha malas and a gold pendant necklace. He has long swept-back dark hair, a white vertical tilak with a red dot on his forehead, and holds a black staff wrapped with a white cord and small gold bells. A pink-lit backdrop is behind him. a person: the long swept-back hair, saffron clothing, rudraksha malas and ceremonial gold necklace on a throne are consistent with the page's reference, but the appearance is only partly distinctive. One person is visible in the foreground, partly cropped.a person seated on an ornate gold-and-red throne, wearing an orange-saffron draped garment with gold borders, multiple rudraksha malas and a large ornamental gold pendant necklace, white tripundra forehead marking with a red bindi, and hoop earrings. He holds a black staff wrapped with white rope and small bells in one hand and gestures while speaking. Brass trays of flowers and fruit lie at the base of the throne, and a pink-toned backdrop fills the background. A partially visible white-clad figure appears at the lower left edge.A seated man in saffron-orange robes sits on an ornate gold throne with red velvet cushions. He wears long rudraksha mala necklaces with gold and gem pendants, a white tripundra and red bindi on his forehead, and gold earrings. He holds a black staff wrapped with white rope and small bells in his raised right hand, and his left foot rests crossed over his leg. Flower petals and offerings lie in the foreground, with a pink backdrop behind the throne. Swamiji (probable): long swept-back hair, saffron robes, multiple rudraksha malas and ornate gold pendants, seated on a throne in a satsang setting.

Kalabhairava-Darshan

67 photosSource gallery
A smiling person with long dark curly hair and a red bindi stands on an ornate golden throne against a pink-lit backdrop. He wears a leopard-print garment with red rudraksha beads and layered silver-toned bead necklaces, red rudraksha bracelets and armbands, and holds a silver trident in his left hand while the right hand rests on his hip. The throne is heavily carved with floral scrollwork, and a water bottle and red flowers sit at the lower left. Appearance-based candidate present: Swamiji (probable), identified by the swept-back hair, rudraksha malas, ornate adornments and trident beside the throne.A smiling person stands on an ornate golden throne against a pink backdrop, holding a silver trident in the left hand and resting the right hand on the hip. The figure has long dark hair, a tilak on the forehead, and wears a leopard-print garment with a red and gold beaded sash, layered rudraksha and red beaded malas, and dark bead bracelets and armbands. Ornate gold-toned throne carvings frame the figure, with a water bottle visible at the lower left edge. Presentation cues include the long hair, trident, and layered malas, consistent with the a person label in this stage-style setting.A standing person in a photograph holds a silver trident in the left hand and rests the right hand on the hip in front of an ornate golden-copper arched throne backdrop lit in pink and red. The person has long, voluminous dark hair, a red bindi, and wears many strands of rudraksha and red-bead malas, a leopard-print wrap with a silver-tone belt, and a tan draped lower garment. Bracelets of red beads are on the wrists and upper arms.A figure with long dark swept-back hair and a red-and-white forehead mark stands in front of an ornate gold-framed throne with a circular arched backdrop lit in pink and red. He holds a silver trident in his right hand, sets his left hand on his hip, and wears rudraksha-style beaded necklaces, a leopard-print and red wrap over the chest, a green-and-red belt, and a flowing rust-coloured skirt. Golden peetha-style carvings frame the seat behind him. The setting suggests a stage tableau. Swamiji (probable) appears in person in appearance-based terms, based on the long hair, trident, rudraksha malas and ornate clothing. A partially visible person stands at the far left edge.Photograph of a staged figure standing beside an ornate golden throne (peetha) with a large ring-shaped golden backdrop lit in pink and red. The figure, with long dark swept-back hair and a red tilak on the forehead, holds a silver trident (trishula) in one hand and rests the other on the hip. He wears a leopard-print top, layered red and orange rudraksha and bead malas, and an ornate necklace, with a long pale draped skirt. Two partially visible people sit at the lower left, and a water bottle sits near the throne. a person appears as a performer on stage by the throne, with cues of long hair, a trident and beaded malas. A watermarked archive copyright line is not reproduced.A smiling person with long, dark, wavy hair and a red bindi stands on an ornate silver-embossed throne-like seat against a pink-lit backdrop. They hold a silver trident in the right hand and rest the left hand on the hip. The outfit includes a leopard-print wrap, a red-orange drape, layered rudraksha malas, beaded bracelets and armbands, and a beaded waist belt. The setting resembles a stage or festival tableau with dramatic colored lighting.

Morning-Puja-and-Satsang

227 photosSource gallery
A photograph of a seated figure on an ornate gilded throne with red velvet cushions, wearing a saffron-orange dhoti and shawl, a rudraksha mala and ceremonial gold necklace, a white forehead band with red tilak, and long swept-back hair. The figure appears to be a person, seated in a position of honour. Beside the throne, a man in white ritual clothes with an orange shawl sits on a chair with his hands folded and eyes lowered. A plate of flower petals, fruit and offerings lies in front, with a vase of orange and white flowers and red-lidded trays of kumkum nearby. Red curtains and a blue backdrop frame the scene, and a few partially visible people sit at the bottom edge.A satsang scene in a red and gold setting. A seated man in saffron-orange dhoti and shawl, with long swept-back hair, a white tilak, rudraksha malas and gold necklaces, holds a black staff wrapped with white garland and smiles while seated on an ornate gold-and-red throne. Two gilded statues in orange and saffron stand behind him with garlands. Women in saris and salwar-kameez sit before him with brass thalis of flowers and offerings, one with palms pressed together. A bearded man in white is at the lower right edge and a person's head is visible in the foreground. Probable Swamiji cues: long swept-back hair, saffron clothing, rudraksha malas and gold necklaces, seated on the throne.Photo of a satsang on a red-draped stage. A man seated on an ornate gold-and-red throne wears an orange dhoti and orange sleeveless top with rudraksha malas and a gold chain, a white vertical tilak on his forehead, and long swept-back hair; he holds up a black staff wrapped with white cord. Probable Swamiji (probable): long swept-back hair, ornate gold chain and rudraksha malas, orange ceremonial clothing, seated on a throne as teacher. Behind him stand two orange-clad deity murtis garlanded with white flowers. Seated before him are several women in saris and salwar, one in pink dupatta with a badge, and a man with a bald head in the foreground. A silver thali with offerings sits on the floor. A stage light stand and a microphone are visible at left.A seated man in saffron-orange robes and a rudraksha mala holds a long black staff wrapped with white cord and bells, extending it forward while sitting on an ornate gold throne with red cushions. He has long swept-back dark hair, a white forehead marking and a multi-strand rudraksha necklace, consistent with the Swamiji (probable) appearance cues. Two saffron-clad wooden statues of standing figures with garlands stand behind him against a red drape. Seated women in sarees, one in red with a red shawl and one in pink, sit before a gold tray holding silver bowls of flowers and offerings. A woman in a dark top and red shawl sits nearby, and a woman in white with a lanyard sits at lower left, several with hands folded. Marigold petals lie on the gold dais. The photo appears to show a satsang or ceremonial seated gathering.A seated man in saffron-orange robes with long swept-back hair, a white forehead band, and multiple rudraksha malas sits on an ornate gold-and-red throne, raising a black staff with white cord and bells. Before him on the floor, women in saffron, red and pink saris sit with a silver tray of offerings, a brass plate and flower petals. Two wooden deity figures in orange dhotis with garlands stand behind a red draped backdrop, and a vase of flowers and a water bottle sit nearby. A woman in a black top with pink dupatta and a lanyard is seated in front, and a few more people are partially visible at the edges.A figure in saffron-orange clothing with long swept-back dark hair, a white forehead band, a rudraksha mala and gold ornaments sits on an ornate gold-and-red throne holding a long black staff wrapped with white cord and bells, Swamiji (probable) by visible cues. Before him, a man in white with an orange shawl sits with hands folded, a woman in a maroon sari and a man in white with orange shawl press palms together in prayer, and devotees' heads are visible in the foreground. Brass thalis of fruit, sweets, flower petals and offerings lie on a golden tray in front of the throne, with a red box of sweets at left, against a red curtain backdrop, a satsang-style puja setting.

Darshan

6 photosSource gallery
A photograph in a wood-panelled hall with a white ceiling and a projector. A long-haired figure in a saffron-orange wrap with multiple rudraksha malas and gold ornaments smiles as he extends a bouquet of yellow flowers, teal wrapping and white garland toward an elderly man with grey hair in a white shirt seen from behind. Behind them, a man in an orange wrap and rudraksha mala watches, and other attendees stand in the background. a person is visible with a white vibhuti forehead mark, a red bindi and a rudraksha mala in the seated-height center of the frame.A photograph inside a hall with wood-panelled walls and recessed ceiling lights. In the foreground, a man in a dark grey shirt kneels and bows with his hands cupped, receiving an object from a long-haired figure bare-chested except for an orange-red cloth draped over the shoulders, wearing a yellow and green flower garland around the neck and a flower garland across the shoulder. The figure holds a red box or tray of offerings. Behind them, a man in an orange robe with rudraksha beads and white sacred-ash markings stands watching, and devotees in white dhotis and saris stand in the background, some with hands folded. A red patterned carpet covers the floor.A long-haired man with a bare chest and a sandalwood-and-vibhuti forehead mark, wearing a rudraksha mala and a thick garland of white flowers with yellow and green accents, stands at right and hands items from an open box toward a smiling man in a maroon shawl who kneels at lower left. A man in an orange cloth and rudraksha beads stands behind the box, and white-clad attendants and a cameraman with a tripod watch in a wood-panelled hall with a white projection screen.A smiling man with long, swept-back dark hair and white vibhuti lines with a red kumkum dot on his forehead stands with a thick garland of white jasmine flowers and yellow marigold tassels draped over his shoulders. He wears a saffron cloth over his bare upper body and a small gold earring. A blurred figure with a white forehead mark appears at the left edge beside a large white screen, and a dark wooden wall forms the backdrop.Photograph inside a wood-panelled hall with a coffered white ceiling and a blank projection screen. In the foreground, a man with long swept-back dark hair, white sandal-paste markings on his forehead and a white and multicoloured flower garland smiles and leans forward toward a red tray. Beside him a shaved-headed man in an orange saffron cloth and rudraksha mala holds a red-dyed object, and behind him a man in white dhoti with a rudraksha mala stands. Orange drapes hang at the back. A video camera on a tripod, and standing devotees in white and saree stand along the left side.A photograph of a smiling man standing on a stage with both arms raised overhead. He wears a long white flower garland, orange-saffron robes, a rudraksha mala, and a white forehead mark. Behind him is a red draped backdrop and a gold-framed red throne, with a pink and blue painted mountain backdrop to the right. A vase of flowers sits on the stage.

Lunch

6 photosSource gallery
A buffet line serving food in a covered hallway. In the foreground a bald, bearded man in a grey t-shirt, orange scarf and orange lanyard holds a white plate of rice and curry, taking food from a steel chafing dish of rice. Behind him an older man in a white cap and white shirt with a beaded necklace waits with a plate, and women in saris and pink tops stand near the serving tables. A young server in a maroon polo and black trousers ladles food from the far left.A close-up photo of a white plate of meal served by a person in grey clothing with a red cloth visible at the shoulder. The plate holds steamed white basmati rice, a yellow-brown potato and chickpea curry, a flatbread roti with charred spots, and a side of mixed vegetables with peas and carrots. A metal spoon rests on the rice. The server's hand holds the plate at right. No deity, ritual or a person candidate is visible, and only a partial hand and arm of one person appear.Photograph of a communal meal line serving food in a hall. A woman with dark hair in a bun and a red shawl, wearing a striped top, holds a white plate with roti, rice-dish and two small metal bowls of curry while using a ladle to serve from steel chafing trays of rice, vegetables and gravy. Behind her, a man in a white shirt with a red scarf and a man in white with a white cap also serve from the counter. Other people in white and pink clothing stand in the background, and one woman in a white and gold sari is at the right edge.A buffet serving line in an indoor covered hall. A smiling young man in a magenta polo shirt and black trousers stands behind steel chafing dishes of rice and vegetables, using a serving spoon. On the right, a woman in a pink and brown sari with glasses holds a plate and ladles curry from a steel tray. Behind them a young woman in a yellow kurta with an orange lanyard holds a plate of flatbread. Several other people stand in the background, including a man in a white shirt with a red shawl and people in white clothing. Steel pots and stacked white plates sit on the counter.A buffet line outdoors on a concrete ledge where people serve themselves from white bowls and plates. In the foreground a man in a white kurta with an orange-red scarf spoons food onto a plate holding rice, vegetables and salad. Beside him a woman in a green dress with layered beaded necklaces holds a white bowl, and a woman in a black-and-white striped top with a lanyard fills her bowl. A man in an olive t-shirt with a red wrist band stands behind them. At left a woman in white with an orange scarf and another person in white serve food, and a potted plant sits at right. Several people stand in the background.A misty outdoor terrace with red brick flooring and metal-framed tables and chairs, where people are seated and eating from plates. A woman with blonde hair in a striped top and light trousers walks barefoot across the centre. Several people in white clothes and orange or red shawls stand and sit nearby, one man in a grey shirt and another in an orange shawl carry plates. A large tree and grey fog fill the background. Watermarked archive photo; no identifiable a person candidate is clearly visible.

Yoga

17 photosSource gallery
Outdoors on green lawn, a group of about fifteen people in white ritual-style clothing sit on coloured yoga mats performing seated forward-bend stretches. Mats are blue, pink and green; sandals rest on the grass at lower left. Most wear white shirts and white dhotis, some with bare feet; one person in the back wears a dark top and another a purple garment. A white fence, a building and a green hedge form the background. No identifiable a person candidate is visible with reliable cues, so no candidate is named.Outdoor yoga session on green grass with several people sitting on colored mats in wide-legged forward stretches. In the foreground a young man in plain white kurta and white pants leans forward with palms flat on a blue mat. Behind him an older man in white and others in white and maroon clothing stretch on pink, purple and orange mats. Sandals lie scattered on the grass beside the mats.Outdoor yoga session on green lawn. Many men sit on colored yoga mats performing forward stretches with legs extended, reaching toward their feet. Foreground: a man in a grey shirt and dark trousers with glasses, and a man in a maroon t-shirt and grey trousers with a gold watch, both bent forward over outstretched legs on pink and green mats. Background participants wear white kurta-style clothes with lanyards, and one wears orange. Red plastic chairs and flowering plants sit behind; a pair of sandals lies on the grass at right.Outdoor yoga session on a lawn with participants seated on coloured mats in forward-bend stretches. In the foreground a bald man in a black t-shirt and white loose trousers sits with legs extended, reaching forward toward his feet on a teal mat. Beside him a man in a maroon shirt and grey trousers stretches on a light green mat. Behind them rows of practitioners in white kurta-style clothes and mixed casual wear sit on pink, blue and purple mats across the grass, with red chairs and trees at the edge of the lawn. A child is partly visible at left.Outdoor yoga session on a green lawn with a light-coloured building and red stacking chairs behind. Participants sit on coloured mats in blue, pink and orange, performing forward-bend stretches. Most wear white kurta-style clothing; one man in front wears white with grey trousers and a lanyard, and another in a dark blue top sits with legs extended. A man in a white kurta with a long white beard sits to the right, and a young man in white sits at the far right. A small device sits on the grass in the foreground. No candidate for a person is clearly identifiable by appearance, so the figures are described by role and clothing only.Outdoor yoga session on a grassy lawn with many participants on coloured mats doing back-bending and bridge-type postures. Most wear white kurta-style clothes or grey and black trousers with plain tops; one man in a maroon shirt and grey trousers in the foreground holds a bridge pose with hands clasped beneath him. Several others lie on their backs or kneel forward in child-pose style. Sandals are placed beside the mats, red plastic chairs and a thatched-roof structure stand in the background, and a building with trees lies beyond the lawn.

eNGenius

8 photosSource gallery
A photograph of a young boy in a green and white striped long-sleeved top and grey trousers performing a forward-bending yoga pose on a red and white striped cloth. He kneels with his forehead and arms extended flat on the mat, bottom resting on his heels. The setting is an indoor room with a dark wall panel and a pale floor.A young boy in a light grey long-sleeved top and camouflage-print shorts sits on a tiled floor in a forward-bending yoga pose, his head bowed low to touch his feet. He wears a thin gold chain with a pendant around his neck. A red-and-white striped mat lies beside him. Behind him, a dark board displays children's crayon drawings, one of a sailboat on blue water, and a white paper sheet is pinned above. No adult or a person candidate is visible.Two young boys practise yoga postures on a beige tiled floor in an ashram-style room. The boy on the left wears a green and white striped t-shirt and dark grey trousers, kneeling with hands on the floor and looking up. The boy on the right wears a grey sweatshirt, camouflage shorts and a thin dark cord necklace, bent forward with hands planted and one leg extended onto a red and white checked mat. Behind them a dark notice board displays children's paper drawings and paintings, and folded clothes sit on a pink cushion.Two boys crouch on a beige tiled floor in an indoor room. In front, a boy in a green-and-white striped t-shirt and grey trousers, barefoot, leans forward on his hands and looks toward the camera. Behind him, a boy in a grey long-sleeved top with camouflage shorts bends over with his hands on the floor. A bulletin board with children's drawings and paintings hangs on the wall, and red-striped mats and a green plastic container sit at the right edge. No a person candidate is visible.Two young boys practise a crouched floor exercise on a tiled floor in a bright room. The boy on the left wears a green and white striped t-shirt, grey trousers and is barefoot, his weight on his hands and one raised foot. The boy on the right wears a grey long-sleeved t-shirt with a printed graphic, camouflage shorts and a thin necklace, leaning forward on his hands. Behind them a corkboard displays children's drawings and paintings, and red-and-white striped mats and mattresses lie on the floor and a green basket sits at right.A young boy in a green and white striped long-sleeved top and grey trousers performs a headstand on a red and white striped mattress against a plain white wall. His hands are planted on the mattress and his legs are lifted straight up. Behind him, another child in a purple top and grey trousers lies face-down on the mattress. A blue and orange plastic container sits at the lower left, and a window with a curtain is at the upper right.

Kalabhairava-Darshan

54 photosSource gallery
A smiling person stands on a stage under pink and red lighting, holding a silver trident in the left hand and resting the right hand on the hip. The figure has long dark swept-back hair, a red tilak on the forehead, and wears layered rudraksha malas of dark beads, a white bead necklace, and a dark heart-shaped pendant. The clothing is a leopard-print garment with red and black beaded trim and a fringed skirt. A large ornate metallic-looking backdrop with repeating circular designs frames the scene. Swamiji (probable) cues include the long swept-back hair, rudraksha malas and ceremonial bead ornaments, with a trident consistent with a Shiva-themed performance costume.Photograph of a smiling person with long, dark, loose hair and a small tilak mark on the forehead, standing under red stage lighting. The person wears a red top with a leopard-print wrap, multiple strands of rudraksha beads and a pale ceremonial necklace, plus a dark pendant. The background shows red-tinted draped fabric and a dim hall.A performer in a red-lit stage setting holds a silver trident (trishul) raised in one hand, wearing a red-and-dark patterned garment, layered red and white beaded necklaces, a rudraksha-style mala, and a vibhuti/kumkum mark on the forehead. Long dark wavy hair falls around the face, and a red-toned backdrop with pink and red lighting fills the frame. The figure appears to portray a deity form in a theatrical or devotional performance.A smiling figure with long dark curly hair and a red bindi stands under pink and red stage lighting, holding a silver trident with a gleaming shaft in the left hand and resting the right hand on the hip. The figure wears a leopard-print cloth, a dense layered rudraksha mala of dark beads and a long white bead necklace, with rudraksha bracelets on the upper arms and wrists. A large embossed red-and-pink backdrop fills the background. a person appears in a stage performance setting with trident and rudraksha adornments.A person stands in front of a glowing pink and red backdrop with embossed metallic panels, holding a silver trident in the left hand and resting the right hand on the hip. The figure has long dark swept-back hair, a bindi, and wears a leopard-print garment with a gold-embroidered skirt, multiple strands of rudraksha-style beads and a white bead necklace, and beaded armlets. The photo appears staged with theatrical lighting and a smiling expression.A smiling person with long, wavy dark hair stands in front of a pink and red stage backdrop, holding a silver trident (trishul) upright in the right hand. The figure wears a leopard-print cloth, layered rudraksha malas and a long beaded necklace, with a bindi and white tilak on the forehead and a small microphone near the mouth. Warm purple and red stage lighting fills the scene. a person is a candidate based on the long hair, trident, rudraksha malas and ceremonial adornments, though the appearance is only partly clear.

01-Morning-Puja-and-Satsang

36 photosSource gallery
A seated group of devotees performs a morning puja inside a hall with orange curtains and wood-panelled walls. In the foreground, a shaven-headed man in an orange-and-gold dhoti and shawl, with a dark rudraksha mala and a silver wristwatch, holds a small object in his hands while a bald-headed man to the left wears white clothes and a white shawl with gold border and mala beads and sits with palms pressed together. Men in white dhotis with gold borders and rudraksha malas sit with palms joined in prayer or hold open books. Incense sticks stand near the cushions. The orange-clad figure shows no distinctive a person cues, so identity is unsure.A monk in saffron-orange robes stands in a wood-panelled hall holding a tall multi-tiered brass aarti lamp with many lit flames, a rudraksha-style bead garland around his neck and a vertical tilak on his forehead. Around him a large seated audience with hands pressed in anjali mudra and some holding small lit lamps, with many women wearing white and red-orange shawls. The scene is a morning puja with aarti during satsang. The monk's distinctive long hair is not visible; he is shaved-headed, so the a person candidate cues are insufficient.A seated congregation during a morning satsang hall session, viewed from the front row. In the foreground a man with short dark hair and rimless glasses wears a red-orange shawl over a red-and-white striped shirt and white dhoti, hands clasped. Beside him a bald man with a beard and orange tilak on his forehead wears a red-orange shawl over a cream kurta, sitting cross-legged with clasped hands and looking forward. Behind them devotees fill the room, including a man in a blue shirt, a woman in a purple sari, and others in white ritual clothes; yoga mats in red and green are stacked on shelves at the back. No clear presentation cues establish a person candidate, so roles are used.A photograph of a seated satsang audience in a warmly lit hall with orange curtains and wooden panelling. In the foreground, a shaved-headed man in saffron and orange robes with a gold-bordered shawl wears a long rudraksha mala and a red tilak; he sits upright and gazes forward. Beside him, a shaved-headed man in a white dhoti with a gold border and a rudraksha mala looks ahead. Behind them, devotees in orange shawls, white clothes and grey wraps sit on mats, some with white sandalwood marks on their foreheads, and several listen with headphones. The setting suggests a morning satsang.A long-haired man in an orange-saffron dhoti and shawl with gold border sits cross-legged on an ornately carved gold throne with red cushions, speaking to an unseen audience. He wears multiple strands of rudraksha mala, a large ceremonial gold pendant necklace with red and green stones, earrings, a white tilak with a red bindi, and a ring on his hand. Behind him is a pink-and-white backdrop, and offerings with flowers are visible at the lower edge of the frame. The figure's appearance with saffron clothing, rudraksha malas, gold necklace and long hair matches the Swamiji (probable) cues on the throne, consistent with a satsang discourse.A seated satsang audience in a hall with patterned walls, viewed from the front. In the foreground, a man in glasses wears a red-and-white striped shirt with an orange shawl and claps his hands. Beside him, a bald man with a light beard wears a cream kurta, an orange shawl and a red bindi, sitting cross-legged with his hands clasped. Behind them, bearded and white-clad devotees sit on mats, some with orange shawls and some wearing headphones. Stacked chairs and a bright red doorway with colourful items appear at the back.

02-Darshan

6 photosSource gallery
A photograph of a long-haired man with white and red forehead markings, wearing an orange-saffron cloth draped over the shoulder, a rudraksha mala and a garland of yellow flowers with green and red accents. He leans forward and extends his hand to a seated, grey-haired man in a white shirt who bows his head toward him. Behind them, a man with a white forehead marking and a second man in white stand in a hall with dark wood-panelled walls and a white projection screen; a camera operator is visible at the left. The scene suggests a blessing or greeting at a satsang gathering. The long-haired figure has long swept-back hair, saffron cloth, rudraksha mala and garland, matching the page's Swamiji cues; the appearance is strong but the image is not fully certain, so swamiji is marked probable and in_person.Photograph of an indoor satsang hall with red wooden panelling and a white projection screen. A long-haired figure with a white tilak on the forehead, wearing an orange cloth wrap, rudraksha malas and a garland of green leaves with yellow and red flowers, stands at right holding a paper and extending a hand toward a red tray of sweets. A seated woman in a purple top with palms pressed together receives the offering at lower left. Behind them an orange-robed man with rudraksha beads stands beside people in white and orange clothes, with a small kalasha-like brass pot visible at left. Appearance-based candidate present, with distinctive long swept hair, orange wrap, rudraksha malas and floral garland, though identity is uncertain.A standing figure with long wavy dark hair, a yellow and green flower garland, bare upper body and a saffron-orange cloth wrap places a hand on the head of a seated man in a dark grey shirt. Beside them, a robed assistant in saffron with a rudraksha mala and tilak holds a red box of sweets and prasad. Other people in white and saffron stand behind, with a camera crew and red draped backdrop in the hall. The scene shows a blessing with prasad distribution.Indoor satsang hall in Kodaikanal. A bare-chested figure with long swept-back dark hair, white vertical tilak on forehead, white jasmine garland and a saffron cloth over the shoulder reaches out to bless the crown of a kneeling man in red at lower left. Behind, a monk in saffron with rudraksha mala holds a tray of red-wrapped offerings, and a bespectacled man in white stands nearby. Cameras on tripods and a monitor showing a screen are visible, with women in white saris and cream clothing in the background.Indoor satsang hall with wood-panelled walls and wall lights. A long-haired figure in a saffron/orange wrap and a white jasmine garland with yellow and green flowers stands bare-chested with his back partly to the camera, placing his right hand on the head of a kneeling man in a red shirt who holds red flowers in cupped hands. A second man in orange robes with a rudraksha mala and white forehead marks stands beside him holding a small box of flowers. Seated devotees, a video camera on a tripod, and a monitor showing the screen are visible behind. a person: the long-haired figure in saffron with a jasmine garland and rudraksha-adorned attire, giving blessing, is the appearance-based candidate. The kneeling man receives darshan.A man in orange-saffron clothing stands beside a gilded golden throne with a red cushion in a red-draped hall. He has long swept-back dark hair, a white sandalwood/vibhuti mark on his forehead, and wears a thick white jasmine garland, rudraksha mala strands, and ornate gold pendant necklaces. A yellow flower is tucked at his shoulder. Behind him stand two decorated deity murtis in orange and silver garments, and a purple backdrop with a rocky scene is visible. Appearance-based identification is a person, shown in person at a satsang setting.

05-Kalabhairava-Darshan

15 photosSource gallery
A photograph of a man seated before an ornate, gold-embossed throne-like chair with a pink backdrop and reddish stage lighting. He has long, dark, tousled hair, a white horizontal forehead mark with a red dot, and wears a leopard-print cloth draped over his shoulder and waist, with a red top beneath. He is adorned with multiple strands of rudraksha beads and white beads, a pendant necklace, and rudraksha armbands on both upper arms. The person appears to be speaking. a person: the long swept hair, rudraksha malas and ornate seated setting are the cues.A seated man with long, dark, swept-back hair and a white vibhuti line with a red dot on his forehead sits before an ornate, gilded throne backrest lit in red and green. He wears a red robe, a leopard-print garment across his chest, and multiple rudraksha malas and beaded necklaces, with a silver pendant at the neck. He extends one arm outward, with rudraksha bracelets on his wrists and upper arm. The lighting is strong red and magenta. The scene appears to be a darshan or satsang setting. Swamiji (probable): the long hair, rudraksha malas, ornate necklaces and red-saffron clothing are consistent with the page's identification of the speaker.A photograph in red-tinted light showing a devotee in white clothing prostrating on the floor, head bowed, with a dark bun of hair visible. Beside them, a figure in saffron-orange garments and layered rudraksha malas with large beads rests a hand on the floor near a tray of red and gold items. A metal pole stands in the foreground. The scene appears to be a ritual prostration or padapuja-style devotion. Two physical people are clearly visible, plus a partly visible person at the left edge.Photograph in a red-lit room with draped red curtains. In the foreground right, a long-haired figure faces left, bare-shouldered, wearing a green and black leopard-print wrap and a long rudraksha mala with a shoulder band of rudraksha beads. To the left, an older woman in white clothing sits with palms pressed together in prayer. Behind them, a man in orange-saffron robes sits near a red-cloth background. A bottle is visible at the right edge. The long-haired figure matches appearance cues for a person, seated and wearing rudraksha malas and a distinctive wrap, while the surrounding people appear as devotees.A photograph taken in a red-lit interior with green light strips in the foreground. On the right, a bare-chested figure with long, swept-back dark hair and many rudraksha malas and bracelets, wearing an orange-red cloth, holds hands with a smiling woman in a white outfit with a red bindi. On the left, a man in white clothes and a rudraksha mala looks toward them. Behind, a man in an orange robe sits near a red curtain. Visible cues on the figure at right include long swept-back hair and layered rudraksha malas, which match a person appearance, but the face is partly turned away and the identification is uncertain. Four physical people are visible.A man seated cross-legged on an ornate gilded throne with carved scrollwork, against a pink and green lit backdrop. He wears a red cloth, a leopard-print garment, layered rudraksha malas and a pendant, and has a white forehead marking with a red bindi. His right hand is raised to his ear in a gesture of listening or teaching, while his left hand rests on his knee. The image appears to be a photograph of a seated speaker on a throne with decorative red lighting.