Skip to content
A screenshot of a Zoom video call grid showing about a dozen participant tiles, most with people in indoor home settings. Several women wear saris and bindis, including one in an orange sari at the top centre and one in a purple sari in the middle row; one man in a dark shirt holds his hands in a greeting. A small tile in the bottom right shows a figure in white robes with an orange shawl standing before a white backdrop, labelled dhyanasankalpa mantra. Several tiles show only name labels such as ma nithya lallith and TN nirmala hosur. The Zoom toolbar and a Windows taskbar frame the image, with the time 9:01 AM on 2021-04-28 in the corner.
Photo 37 of 43 from 28 April 2021